You are here: Home / Products / Packaging Machine / Cartoning Machine

Product Category

Hot-Selling Products

Cartoning Machine
Cartoning Machine Cartoning Machine
Cartoning Machine Cartoning Machine

loading

Cartoning Machine

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
  • ZHJ

  • CHINNOFI

Availability:
Quantity:
INTRODUCTION

 

This machine is suitable for packing blisters, tubes, ampoules and other related objects into boxes intermittently. The highest speed can up to 120 boxes/min.It has advantage of high packing efficiency and good quality. This machine can fold leaflet, open box, insert blister into box, emboss batch number and close box automatically. It adopts frequency inverter to adjust speed, human machine interface to operate, PLC to control, and photoelectric to supervise and control each station the reasons automatically, which can solve the troubles in time. This machine can be used separately, and also can be linked to other machine to be a production line. Note: this machine can also equip with hot melt glue device to do hot melt glue sealing for box.

REFERENCE PICTURE

 123

MAIN TECHNICAL PARAMETERS


model

ZHJ-150

ZHJ-260

Production capacity (box/min)

60-120

150-260

Size of box (mm)(L×W×H)

(58-200)×(25-100)×(15-70)

(65-170)×(28-870)×(15-55)

Specification of box

250-350g/m2

250-350g/m2

Size of leaflet (L×W)

(100-180)×(100-220)mm

(110-320)×(100-180)mm

Specification of leaflet

55-65g/m2

55-65g/m2

Volume of air consumption

15m3/h(pressure 0.5-0.7Mpa)

Total power

1.5Kw

2.2Kw

Power supply

AC380V 50Hz 3phase

AC380V 50Hz  3phase

Overall dimension

4300×1150×1500 mm

4400×1500×1800 mm

Weight

1200 kg

4000 kg

FAQ
 

Q1: Manufactureror trading company?

A1: We are manufacturer with own factory and exporting department.


Q2: What's the lead time ofyour machine?

A2: Normally it's about 30~45 working days


Q3: What's the payment terms?

A3:30% deposit TT, 70% paid before shipment; or L/C


Q4: Can we check machine before order?

A4: Yes, welcome to visit our factory and check machine anytime.


Q5: Does the machine power voltage meet buyers' factory power source?

A5: We can do it as your request.


Previous: 
Next: